The parking areas for B,C and E ranges are plowed.The entrance gate and the road going in and out of our Range is also plowed.The walkways to the Bathrooms and the Range House got shoveled as well.
Snow damage is as follows:
The gutters on both side of the tractor shed with need to be repaired or replaced.The roof on the exit gate house will need to be replaced.Those are the only things that I saw that we will need to work on. Time will tell if there is more.